How to Price a Job as a Tradie in NZ: Labour, Materials and Markup

A practical guide for NZ tradies to price jobs properly: your true hourly cost, material markup, overhead recovery and profit margin, with GST at 15%.

By Peter Mastras

Quick answer: To price a job in New Zealand, work out your true cost per hour (wage, employer costs, insurance, vehicle, tools and unbillable time), add overhead recovery and a profit margin of 15 to 25% to set your labour rate, charge materials at cost plus 15 to 30%, estimate hours from past jobs with a 20 to 30% buffer on new work, then check the total against local market rates. GST at 15% goes on top, as its own line.

Pricing is the hardest skill in the trades. Price too high and the job goes to someone else. Price too low and you win it but lose money doing it. The framework below is the one most profitable tradies follow, whether they have written it down or not.

Once the job is priced, here is how to write and send the quote.

Start with your true cost per hour

Most tradies underprice because they count only their wage. Your real cost per hour also includes:

  • Your take-home pay or drawings
  • Retirement savings and any employer contributions you pay for staff
  • Public liability and other insurance
  • The vehicle: fuel, registration, finance and maintenance
  • Tools and equipment, spread over their working life
  • Unpaid hours: quoting, admin, travel, sick days and public holidays
  • Accounting, GST returns and software

Take a sole trader who wants $80,000 a year to take home, bills 1,500 hours (not 2,000, because quoting, travel and admin eat the rest) and carries $25,000 of business costs. That person has to bill at least $70 an hour just to break even. Add a 20% profit margin and the minimum becomes about $84 an hour, before GST. Compare that to what you charge now. Many tradies are surprised.

Example: building an hourly rate from the ground up

ComponentExample (sole trader)
Take-home target$80,000 a year
Billable hours1,500 a year
Business costs$25,000 a year
Break-even rateabout $70 an hour
Plus 20% profit marginabout $84 an hour minimum

The figures are an illustration, not a benchmark for your trade or region. Put in your own.

How to price materials

Buy at trade price and charge at cost plus a markup of 15 to 30%, not at cost. The markup pays for:

  • The time spent sourcing, ordering, collecting and delivering
  • Offcuts and wastage
  • The risk of prices moving between quote and purchase
  • The money you have tied up until the client pays

Handling materials is part of the service you provide. Quoting them at cost gives that service away.

Estimating hours accurately

Hours are where most underpricing happens, and the fix is a habit: record the actual hours on every job. Most tradies guess eight hours and find it took eleven. After ten jobs you know your tiling takes 40% longer than your gut says, and that knowledge is worth thousands a year. For a job type you have not done before, add a 20 to 30% buffer until you have your own data.

Overhead recovery

Overhead is everything you spend to run the business that is not on a particular job: insurance, accounting, phone, software, your website and advertising. Divide the year's overhead by your billable hours and add the result to every hour you bill. For example, $15,000 of overhead over 1,500 hours is $10 an hour of recovery.

Profit margin

Profit is not the same as your wage. It is what is left after every cost, including your own labour at a fair rate. Aim for a net margin of 15 to 25% on jobs. Below 10%, any cost overrun or quiet month hurts. Above 30% is sustainable only when you have a clear edge over the next tradie.

GST: price before it, show it separately

Work out your price excluding GST, then add GST at 15% as its own line on the quote. If you are not registered you do not add it. Registration is required once your turnover, or expected turnover, reaches $60,000 over 12 months, and a registered business that quotes GST-inclusive prices should still show the GST amount so the client can see it. Check the Inland Revenue pages before you decide, because the rules for your situation may differ.

Market rates as a sanity check

Build the price from the bottom up, costs plus overhead plus profit, then compare it with what others charge near you. Well above market means a cost problem or a premium you need to explain. Well below usually means you are underpricing. Rates differ between the main centres and smaller towns, so compare like with like.

The mistake most tradies make

They price the job they hope to get, not the job they might get. A job that looks simple from the doorway, such as a bathroom retile or a switchboard upgrade, often has a surprise under it: a rotten subfloor, wiring that falls short of current standards. Price the realistic job, state your assumptions on the quote, and agree changes in writing before doing extra work.

Related guides

Sources

  1. Inland Revenue: GST (goods and services tax)
  2. Inland Revenue: Registering for GST
  3. Consumer Protection (NZ): Fair Trading Act

Frequently asked questions

How do I work out my hourly rate as a tradie in NZ?

Add your take-home target to your yearly business costs and divide by the hours you can realistically bill, which is usually closer to 1,500 than 2,000 a year. Then add a profit margin of 15 to 25%. For example, $80,000 plus $25,000 over 1,500 hours is $70 an hour to break even, and about $84 with a 20% margin, before GST.

How much should I mark up materials?

Cost plus 15 to 30% is a common range. The markup covers sourcing, delivery, offcuts, the risk of price changes and the money tied up until you are paid.

Should my prices include GST?

Work out the price excluding GST and add 15% as a separate line if you are registered. Registration is required once turnover, or expected turnover, reaches $60,000 over 12 months. Check the Inland Revenue pages for your own situation.

How big a buffer should I add when I have not done the job before?

A buffer of 20 to 30% on your estimated hours until you have records of your own. Record the real hours on each job so the buffer shrinks as your data grows.

Can I charge more than the quote if the job runs over?

Only for a change the client has agreed to. The Consumer Protection website says quotes and estimates can be misleading if the final cost is bigger than the client expected, so state your assumptions on the quote and agree any variation in writing before you do the work.

STOP QUOTING MANUALLY

Generate a professional quote in under 30 seconds.

TRY FREE FOR 7 DAYS →

MORE QUOTING GUIDES

How to Write a Quote for a Job: New Zealand Trade Quote Guide (2026)Why NZ Tradies Who Quote Fast Win More WorkElectrician Quote Template (NZ): What to Include and How to PricePlumbing Quote Template (NZ): How to Quote Plumbing JobsBuilder's Quote Template (NZ): How to Quote Construction WorkHow to Quote a Painting Job: New Zealand Painter's Pricing Guide
← All guidesPricingHomeCompare the best trade quoting software